This document contains the upcoming maintenance windows for all production environments of Serviceaide Luma. These windows include both application and infrastructure maintenance.
Lum Production Maintenance falls into three categories:
- Monthly Planned: Our monthly maintenance windows for Standard or Normal maintenance are scheduled at least 1 month in advance. Maintenance windows are scheduled during non-business hours for the geographic location of the environment. Service interruptions and/or performance degradation may be noted during these windows. There is limited client input over these scheduled windows as maintenance performed during these periods will impact multiple or all clients. A reminder notification will be sent at least 7 days prior to these maintenance windows with exact details on the changes and any disruption to service. See table below for dates.
- Critical Planned: Periodically, critical or emergency maintenance involving security or system stability may be required. A 72-hour notice will be provided to customers for these activities. Planned maintenance does not count against the uptime SLA.
- Unplanned: Unplanned downtime is any loss of production system availability that is not noticed more than 72 hours in advance. These downtimes are generally system fault type issues but can also be proactive emergency maintenance performed to prevent a system failure from occurring. Notices will be sent as soon as the maintenance is scheduled or monitoring has determined a degradation in service. These types of downtime count against the uptime SLA and, therefore, are infrequent.
It is necessary to have regular planned 'maintenance windows' to upgrade the application and infrastructure as well as perform preventative measures essential to maintaining a stable, secure and optimized service. The details of the maintenance including exact start times and any disruption to service will be communicated closer to the date in accordance with our notification policies. Each production environment will have a different start and end times based on their geographic location and business hours.
Production Maintenance Windows | |
---|---|
Month | Date |
February 2019 | 17-Feb |
March 2019 | 17-Mar |
April 2019 | 21-Apr |
May 2019 | 19-May |
June 2019 | 16-Jun |
July 2019 | 21-Jul |
August 2019 | 18-Aug |
September 2019 | 22-Sep |
October 2019 | 20-Oct |
November 2019 | 17-Nov |
December 2019 | 15-Dec |
New Schedule
We are looking at a new schedule for 2019 please check back for updates
Please contact technical support if you have any questions about monthly maintenance or other aspects of the service.
Staging, trial and test environments are non-production systems and therefore are not held to the same uptime SLA and notification policies as Production. Maintenance on these environments will be communicated on the community and via announcements. Normal application maintenance will be done first on Staging giving customers validation time before being done in production.
Note
This schedule is non-binding, subject to change and is for general information purposes only. Serviceaide reserves the right to revise the maintenance schedule and then shall provide notice in the manner and to the extent described in the notice provision of the applicable customer agreement.